Plasma Build | Progress report

by on Sunday, November 21st, 2010

 

The last two weeks have been kind of slow as far as progress. I started off with ordering some of the steel to make the leg section of the table. This included the 2 x 3 inch rectangular tube  and the 1/4 x 2 flat stock used for the mounting pads. I am making the leg section in a way that I can disassemble and move it with ease. So the legs are all bolted together using a piece of 1/4 by two 5 inches long with either four drilled holes or four tapped holes.

 

(more…)

Plasma Table | Gear box

by on Thursday, November 4th, 2010

I started off this week with getting under way with the constriction of the gear boxes for my CNC plasma table. I started with just the simple task of squaring up the side pieces to bring them into size. Once completed I would be able to utilize the CNC mill to put in all of the holes.